Target Reliability Index of Transmission Line Crossing High Speed Railway

ZHANG Ziyin, TIAN Lei, GONG Jinxin, LI Hongnan, FENG Yunfen

Electric Power Construction ›› 2014, Vol. 35 ›› Issue (5) : 28-33.

PDF(612 KB)
PDF(612 KB)
Electric Power Construction ›› 2014, Vol. 35 ›› Issue (5) : 28-33. DOI: 10.3969/j.issn.1000-7229.2014.05.005

Target Reliability Index of Transmission Line Crossing High Speed Railway

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2014, 35(5): 28-33 https://doi.org/10.3969/j.issn.1000-7229.2014.05.005

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(612 KB)

Accesses

Citation

Detail

Sections
Recommended

/