• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2015, Vol. 36 ›› Issue (4): 21-26.doi: 10.3969/j.issn.1000-7229.2015.04.004

Previous Articles     Next Articles

Overvoltage Analysis and Restrain Measures for Grid with Small Hydropower

CHEN Zhifeng1, CHEN Juan2, LI Haifeng2, ZHONG Qing2   

  1. 1. Shaoguan Power Supply Bureau, Guangdong Power Grid Company, Shaoguan 512026, Guangdong Province, China;2. Electric Power College, South China University of Technology, Guangzhou 510640, China
  • Online:2015-04-01
  • Supported by:

    Project Supported by National Natural Science Foundation of China(NSFC)(51477057).

Abstract:

Under the condition that the development and utilization of new energy are vigorously advocated in China, the construction of small hydropower has developed rapidly. However, due to the lack of standardized management, the operation of small hydropower often leads to overvoltage in regional power network. Therefore, combined with the characteristics of small hydropower, this paper constructed the equivalent analysis model of power grid with small hydropower. On this basis, the theoretical analysis was carried out on the serious overvoltage process occurred in three situations: the isolated operation of small hydropower, transferring power supply and going into the wet season. The generation mechanism of overvoltage was studied; and the restrain measures were proposed for the overvoltage from the technical and management level, according to different overvoltage conditions. Finally, based on simulation software DIgSILENT/PowerFactory, this paper constructed the model for actual power grid with small hydropower, and verified the correctness of theoretical analysis and the effect of restrain measures.

Key words: small hydropower, isolated operation, transferring power supply, overvoltage control

CLC Number: