Scheduling Strategy Based on MILP for Assembly Enterprises Participating in Demand Response

QI Bing, XIA Yan, LI Bin, LI Dezhi, CUI Gaoying

Electric Power Construction ›› 2018, Vol. 39 ›› Issue (9) : 1-8.

PDF(3652 KB)
PDF(3652 KB)
Electric Power Construction ›› 2018, Vol. 39 ›› Issue (9) : 1-8. DOI: 10.3969/j.issn.1000-7229.2018.09.001

Scheduling Strategy Based on MILP for Assembly Enterprises Participating in Demand Response

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2018, 39(9): 1-8 https://doi.org/10.3969/j.issn.1000-7229.2018.09.001

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(3652 KB)

Accesses

Citation

Detail

Sections
Recommended

/