PDF(498 KB)
Charactersitic analysis for test running after WFGD bypass blocked out
Electric Power Construction ›› 2010, Vol. 31 ›› Issue (12) : 87-89.
PDF(498 KB)
PDF(498 KB)
Charactersitic analysis for test running after WFGD bypass blocked out
Abstract This paper introduced the test running process of dingzhou power plant’s third unit after WFGD bypass blocked out.The effection caused by bypass blocked out and the corresponding resolvents are sxpatiated.Some of this paper’s emphases are those factors which affect the reliability of this unit.
/
| 〈 |
|
〉 |