Charactersitic analysis for test running after WFGD bypass blocked out

Electric Power Construction ›› 2010, Vol. 31 ›› Issue (12) : 87-89.

PDF(498 KB)
PDF(498 KB)
Electric Power Construction ›› 2010, Vol. 31 ›› Issue (12) : 87-89.

Charactersitic analysis for test running after WFGD bypass blocked out

Author information +
History +

Abstract

Abstract This paper introduced the test running process of dingzhou power plant’s third unit after WFGD bypass blocked out.The effection caused by bypass blocked out and the corresponding resolvents are sxpatiated.Some of this paper’s emphases are those factors which affect the reliability of this unit.

Cite this article

Download Citations
Charactersitic analysis for test running after WFGD bypass blocked out[J]. Electric Power Construction. 2010, 31(12): 87-89