Construction Scheme for Lead-out Tension Stringing of Jishixia Hydropower Station

Yi-kui JIN

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (1) : 124-127.

PDF(748 KB)
PDF(748 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (1) : 124-127.

Construction Scheme for Lead-out Tension Stringing of Jishixia Hydropower Station

  • Yi-kui JIN
Author information +
History +

Abstract

The terrain condition for the 330 kV power transmission project of Jishixia hydropower station is complex and the construction environment is bad. It is analyzed that this project has suffered from a series of problems such as conductor upward, big enveloping angle of conductors, and over load of the connecting pipe under pressure or its protecting steel armor when passing the pulley. On this basis, this paper proposed relevant solutions and schemes. The implemented construction proved the feasibility of the proposed scheme, which can provide reference for tension stringing projects in mountainous areas.

Cite this article

Download Citations
Yi-kui JIN. Construction Scheme for Lead-out Tension Stringing of Jishixia Hydropower Station[J]. Electric Power Construction. 2011, 32(1): 124-127
PDF(748 KB)

Accesses

Citation

Detail

Sections
Recommended

/