PDF(480 KB)
Design for External Insulation of Over-head Power Transmission Line and Air Gap of Transmission Tower in High Altitude Area
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (1) : 38-40.
PDF(480 KB)
PDF(480 KB)
Design for External Insulation of Over-head Power Transmission Line and Air Gap of Transmission Tower in High Altitude Area
In allusion to the frequent accidents occurred in the 110 kV Dangxiong-Naqu-Anduo transmission line in Tibet, reasons for line trip were researched. It was analyzed that changes of atmosphere density and atmosphere pressure can affect the safety and stability of over-head power transmission lines’operation. On the basis of maintaining safe operation at a reasonable project cost, the algorithms for the external insulation design of newly-constructed over-head transmission lines, and the air gap of transmission towers in high altitude areas were deduced, which can effectively solve problems in this regard.
/
| 〈 |
|
〉 |