Constructing Drawings Management Budget Based on Engineering Volume Management Concept

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (1) : 99-103.

PDF(615 KB)
PDF(615 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (1) : 99-103.

Constructing Drawings Management Budget Based on Engineering Volume Management Concept

Author information +
History +

Abstract

It is worthy to study the effective cost control since the State Grid Corporation has vigorously implemented the engineering volume management. Based on the previous concept of constructing budget drawings, the concept of constructing drawings management budget has been proposed in this paper. By deep analyzing the construction drawings budget of amount difference, the real-time monitoring of the amount of construction, materials and costs in the construction had been enhanced in order to improve the management level in engineering. The case study shows that the application effect of the construction drawings management budget is significantly, and it is strongly operational and applicable, which can provide a decision-making support for the power transmission project management.

Cite this article

Download Citations
Constructing Drawings Management Budget Based on Engineering Volume Management Concept[J]. Electric Power Construction. 2011, 32(1): 99-103
PDF(615 KB)

Accesses

Citation

Detail

Sections
Recommended

/