Experiment and Application on Belled Rock-anchor Pile Foundation

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (10) : 34-37.

PDF(1499 KB)
PDF(1499 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (10) : 34-37.

Experiment and Application on Belled Rock-anchor Pile Foundation

Author information +
History +

Abstract

In this paper, for solving the adaptability and rock creep of foundation using in strongly weathered areas, the belled rock-anchor pile foundation is proposed and applied on the basis of the mechanical characteristics and loading test. The enlarged pile bottom and upper winding anchor technology are used for expanding the scope of application. In addition, the foundation can improve the bearing capacity, effectively slow the development of rock fractures and reduce the displacement of the rock anchor pile, providing references for similar projects.

Key words

rock-anchor pile / belled / winding anchor / loading test

Cite this article

Download Citations
Experiment and Application on Belled Rock-anchor Pile Foundation[J]. Electric Power Construction. 2011, 32(10): 34-37
PDF(1499 KB)

Accesses

Citation

Detail

Sections
Recommended

/