Common Quality Problems and Control of Factory Preparation for Four Major Pipes in Ultra Supercritical Thermal Power Units

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (12) : 100-104.

PDF(1590 KB)
PDF(1590 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (12) : 100-104.

Common Quality Problems and Control of Factory Preparation for Four Major Pipes in Ultra Supercritical Thermal Power Units

Author information +
History +

Abstract

In this paper, common quality defects during factory preparation of the four major pipes in ultrasupercritical thermal power units are summarized and analyzed, such as surface quality, offdimension, hardness abnormal and metallographic structure abnormal, weld defects and so on. Then the corresponding quality control measures and suggestions are put forward, providing references for further improving the processing quality of the four major pipes.

Cite this article

Download Citations
Common Quality Problems and Control of Factory Preparation for Four Major Pipes in Ultra Supercritical Thermal Power Units[J]. Electric Power Construction. 2011, 32(12): 100-104
PDF(1590 KB)

Accesses

Citation

Detail

Sections
Recommended

/