The Analysis and Treatment of Steam Leakage for High Pressure Casing Split of a 1 000 MW Turbine

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (12) : 114-116.

PDF(1194 KB)
PDF(1194 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (12) : 114-116.

The Analysis and Treatment of Steam Leakage for High Pressure Casing Split of a 1 000 MW Turbine

Author information +
History +

Abstract

The ultrasupercritical 1 000 MW units of Dongfang Turbine Co., Ltd. which have been put into production, are found to have the partial steam leakage problem in high pressure casing split. Based upon the past experiment, this paper develops some targeted construction measures, including proper handling the clearance of casing split and radial clearance of vapor lock, adjusting the clearance of the paw rest pin, adopting reliable sealing grease and thermal tightening of bolts, and so on. These measures work fine during installation process and avoid the steam leakage successfully.

Cite this article

Download Citations
The Analysis and Treatment of Steam Leakage for High Pressure Casing Split of a 1 000 MW Turbine[J]. Electric Power Construction. 2011, 32(12): 114-116
PDF(1194 KB)

Accesses

Citation

Detail

Sections
Recommended

/