The Safety Planning for Erection of the Tower for Zhoushan Island-Mainland Large-crossing Transmission Project

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (4) : 113-116.

PDF(1196 KB)
PDF(1196 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (4) : 113-116.

The Safety Planning for Erection of the Tower for Zhoushan Island-Mainland Large-crossing Transmission Project

Author information +
History +

Abstract

The tubular tower for Zhoushan island-mainland large-crossing transmission project, 370 m in height, is characterized by super height, large weight and huge body and has high risks in tower erection. A safety planning is carried out and implemented in terms of safety training, safety protection facilities, safety monitoring system and control and communication system, which effectively avoids the safety risks caused by possible object falling, object impact and mechanical damage.

Cite this article

Download Citations
The Safety Planning for Erection of the Tower for Zhoushan Island-Mainland Large-crossing Transmission Project[J]. Electric Power Construction. 2011, 32(4): 113-116
PDF(1196 KB)

Accesses

Citation

Detail

Sections
Recommended

/