• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2011, Vol. 32 ›› Issue (4): 117-120.

Previous Articles     Next Articles

Installation Techniques for UHV Convertor Transformers under Extraordinary Working Conditions

  

  • Received:2011-02-14 Revised:2011-02-18 Online:2011-04-01 Published:2011-04-15

Abstract:

Based on the installation practices of converter transformers of the Xiangjiaba-Shanghai ± 800 kV UHV DC demonstration project, the paper analyzes the procedures, key links and controlling process for installation of the UHV converter transformer, and proposes the installation techniques for UHV converter transformers under extraordinary conditions.