Construction Techniques of Tension Stringing Pulley Hanging for the ±800 kV UHVDC Transmission Line

tangliangyou 2   

  • Received:2011-01-14 Revised:2011-02-18 Online:2011-04-01 Published:2011-04-15
  • Contact: tangliangyou E-mail:tly3337@sina.com

Abstract:

Based on the characteristics of the Xiangjiaba-Shanghai ± 800 kV UHVDC transmission line,this paper introduces the pulley hanging scheme of the tension stringing method called“one-drag-four plus one-drag-two”. In this scheme the L-shaped eccentric joint-board is designed to avoid the unbalance problem of the stringing pulley block.Construction practice demonstrates that the L-shaped joint-board has high efficiency in application and can solve several key problems in stringing construction. The design of this scheme and construction process can provide a reference to relevant technicians.