PDF(1313 KB)
Problems Encountered in Auxiliary System of Direct Air-cooling Turbine and Their Treatment
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (5) : 76-79.
PDF(1313 KB)
PDF(1313 KB)
Problems Encountered in Auxiliary System of Direct Air-cooling Turbine and Their Treatment
Based on the features of the auxiliary system of 660 MW direct air cooling turbine from Guohua Dingzhou Power Generation Co., Ltd., the problems encountered in commissioning process are analyzed and the solution is proposed thereafter. The investigation results can be referenced for similar systems.
/
| 〈 |
|
〉 |