PDF(1125 KB)
Analysis and Treatment about Pipe Blockage of Ash-conveying System during the Period of Adjustment and Test in Power Plant
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (5) : 84-87.
PDF(1125 KB)
PDF(1125 KB)
Analysis and Treatment about Pipe Blockage of Ash-conveying System during the Period of Adjustment and Test in Power Plant
The pipe blockage occurs during the debugging and operating period of dense phase pneumatic ash-conveying system in 3 × 300 MW units of the power plant of Lanzhou aluminum plant. The causes are analyzed, and the preventive countermeasures and solutions proposed accordingly, providing guidance to the operators for judging reasons and adopting effective measurements.
/
| 〈 |
|
〉 |