PDF(649 KB)
Application of Object-oriented Technology on Optimized Scheduling System of Hydropower Stations
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 1-4.
PDF(649 KB)
PDF(649 KB)
Application of Object-oriented Technology on Optimized Scheduling System of Hydropower Stations
For developing the optimized scheduling system of hydropower stations of provincial power networks,the object-oriented technology is applied.The optimized object-oriented scheduling system is designed and developed by constructing the model-method library,abstracting generality characteristics,and separating the optimization algorithm and operation flow using interface technology.
object-oriented technology / abstract / interface / hydropower stations / software designing
/
| 〈 |
|
〉 |