Application of Object-oriented Technology on Optimized Scheduling System of Hydropower Stations

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 1-4.

PDF(649 KB)
PDF(649 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 1-4.

Application of Object-oriented Technology on Optimized Scheduling System of Hydropower Stations

Author information +
History +

Abstract

For developing the optimized scheduling system of hydropower stations of provincial power networks,the object-oriented technology is applied.The optimized object-oriented scheduling system is designed and developed by constructing the model-method library,abstracting generality characteristics,and separating the optimization algorithm and operation flow using interface technology.

Key words

object-oriented technology / abstract / interface / hydropower stations / software designing

Cite this article

Download Citations
Application of Object-oriented Technology on Optimized Scheduling System of Hydropower Stations[J]. Electric Power Construction. 2011, 32(6): 1-4
PDF(649 KB)

Accesses

Citation

Detail

Sections
Recommended

/