Aerial Transfer Technology of Pulling Rope during Stringing for Large-crossing Transmission Project

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 105-107.

PDF(578 KB)
PDF(578 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 105-107.

Aerial Transfer Technology of Pulling Rope during Stringing for Large-crossing Transmission Project

Author information +
History +

Abstract

The transmission project between Zhoushan and mainland need to cross international navigational route,of which the stringing and construction should have no effect on the navigation.After putting through a primary leading rope,the leading ropes and pulling ropes remained need to be completed by stretch switching and aerial transfer technology.Therefore,the aerial transfer,methods,procedures and operational requirements are introduced for the leading and pulling ropes crossing the tower.

Cite this article

Download Citations
Aerial Transfer Technology of Pulling Rope during Stringing for Large-crossing Transmission Project[J]. Electric Power Construction. 2011, 32(6): 105-107
PDF(578 KB)

Accesses

Citation

Detail

Sections
Recommended

/