Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 114-117.

PDF(687 KB)
PDF(687 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 114-117.

Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler

Author information +
History +

Abstract

In the paper,the design of the temporary flushing pipes for 1 000 MW ultra super-critical unit boiler in Huaneng Shantou Haimen Power Plant is introduced.The impact factors considered for the design,such as thermal stress,performance compensation and thermal expansion etc.,are discussed,providing reference for similar design of coal or gas fired units.

Cite this article

Download Citations
Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler[J]. Electric Power Construction. 2011, 32(6): 114-117