Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 114-117.
PDF(687 KB)
PDF(687 KB)
Design of Temporary Flushing Piping for 1 000 MW Ultra Super-critical Boiler
In the paper,the design of the temporary flushing pipes for 1 000 MW ultra super-critical unit boiler in Huaneng Shantou Haimen Power Plant is introduced.The impact factors considered for the design,such as thermal stress,performance compensation and thermal expansion etc.,are discussed,providing reference for similar design of coal or gas fired units.
/
| 〈 |
|
〉 |