New Research Development of 1 000 MW Hydro-generator Units

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 62-66.

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 62-66.

New Research Development of 1 000 MW Hydro-generator Units

Author information +
History +

Abstract

The planned hydro-power projects of Wudongde and Baihetan in the lower reach of Jinshajiang River are to be built soon after the pre-feasibility and feasibility study,where the single-machine capacity can reach to 1 000 MW.The new development for the feasibility research on design,manufacture and engineering application technology are summarized for 1 000 MW hydro-generator units,and the research emphases for the next stage presented.Based on the domestic technology,the studies show that it is feasible to design,manufacture and transport of 1 000 MW hydro-generator units in Wudongde and Baihetan,without big constraints existing.

Cite this article

Download Citations
New Research Development of 1 000 MW Hydro-generator Units[J]. Electric Power Construction. 2011, 32(6): 62-66

Accesses

Citation

Detail

Sections
Recommended

/