Optimal Operation of Generator Cooling Water System for Ultra-supercritical Units

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 99-101.

PDF(325 KB)
PDF(325 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (6) : 99-101.

Optimal Operation of Generator Cooling Water System for Ultra-supercritical Units

Author information +
History +

Abstract

This study aims to analyze the problems occurring in the operation of cooling water system in the No.3 units of Chaozhou Power Plant.The suggestions to optimize the system are proposed,including keeping the system rigorous,adopting the condensation water of high speed mixed bed outlet as supplement water during normal operation,and shutting down the sampling gate except for sampling in order to reduce water consumption and maintain the system stability.

Cite this article

Download Citations
Optimal Operation of Generator Cooling Water System for Ultra-supercritical Units[J]. Electric Power Construction. 2011, 32(6): 99-101
PDF(325 KB)

Accesses

Citation

Detail

Sections
Recommended

/