New Method for Repetition Measurement and Pits Allocation of Mountainous Area Transmission Line

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 117-119.

PDF(341 KB)
PDF(341 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 117-119.

New Method for Repetition Measurement and Pits Allocation of Mountainous Area Transmission Line

Author information +
History +

Abstract

Through the analysis of main difficulties of pits allocation for mountainous area transmission line, a new method for repetition measurement and pits allocation is proposed based on the global position system(GPS) and theodolite. It has been found that the method applied in the pits allocation for mountainous area transmission line is efficient, and of positive effect for lowering the construction cost, shortening the negotiation time for crop compensation, reducing external interference and dangers, and also protecting the environmental resources.

Key words

global position system(GPS) / repetition measurement / pits allocation / mountainous area transmission line

Cite this article

Download Citations
New Method for Repetition Measurement and Pits Allocation of Mountainous Area Transmission Line[J]. Electric Power Construction. 2011, 32(7): 117-119
PDF(341 KB)

Accesses

Citation

Detail

Sections
Recommended

/