Close-loop Tests of Thyristor Valve Base Electronics and Control & Protection System in ±660 kV HVDC Transmission Project

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 29-33.

PDF(1031 KB)
PDF(1031 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (7) : 29-33.

Close-loop Tests of Thyristor Valve Base Electronics and Control & Protection System in ±660 kV HVDC Transmission Project

Author information +
History +

Abstract

Valve base electronics, connecting thyristor valve and DC control & protection equipment, is of importance to control and protect the thyristor valve. In the ±660 kV HVDC power transmission project, the thyristor valve and the control & protection system are supplied by different providers. In order to verify functions and performance of the interface between thyristor valve and control & protection equipment, the real-time close-loop simulation tests are carried out, where the overall situation is presented, the key technical problems and countermeasures are discussed, and the verification results are proposed. Close-loop tests of thyristor valve base electronics and control & protection system lay down solid foundation for on-site commissioning and successfully putting into operation of the project.

Key words

HVDC power transmission / control and protection / valve base electronics / close-loop test

Cite this article

Download Citations
Close-loop Tests of Thyristor Valve Base Electronics and Control & Protection System in ±660 kV HVDC Transmission Project[J]. Electric Power Construction. 2011, 32(7): 29-33
PDF(1031 KB)

Accesses

Citation

Detail

Sections
Recommended

/