Programs of the Main Electrical Connection Study of 1 000 MW Generators

zhiYing QIN   

  • Received:2011-02-28 Online:2011-08-01 Published:2012-02-23
  • Contact: zhiYing QIN E-mail:zyqin3692@163.com

Abstract:

Based on the construct proportion,system accessing conditions and the main electrical connection requirements of the second power station in Pingdingshan,the paper proposes 4 main electrical connection programs of the first stage project. By comparing from the technology aspect and the economy aspect,the paper recommends that the project uses one and a half circuit breakers connection program.