Analysis and Countermeasures of High Deposit Rates in 600 MW Supercritical Once-through Boiler

Electric Power Construction ›› 2011, Vol. 32 ›› Issue (9) : 78-80.

PDF(442 KB)
PDF(442 KB)
Electric Power Construction ›› 2011, Vol. 32 ›› Issue (9) : 78-80.

Analysis and Countermeasures of High Deposit Rates in 600 MW Supercritical Once-through Boiler

Author information +
History +

Abstract

The chemistry check-up is made in the first maintenance of the supercritical once-through boiler 600 MW units in Henan Province. It is shown that the deposit rates are high on the water-cooled wall, coal economizer, and the turbine blade. The formation of salt deposition is complicated in the turbine blade. According to the operational status, the reasons are analyzed and the suggestions provided.

Key words

supercritical once-through boiler / scale formation / salt deposition / feed water treatment / deposit rate

Cite this article

Download Citations
Analysis and Countermeasures of High Deposit Rates in 600 MW Supercritical Once-through Boiler[J]. Electric Power Construction. 2011, 32(9): 78-80
PDF(442 KB)

Accesses

Citation

Detail

Sections
Recommended

/