• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2012, Vol. 33 ›› Issue (10): 106-109.

Previous Articles     Next Articles

Installation Technology of HD1080A Turbine in 1 000 MW Nuclear Power Unit

  

  • Received:2012-07-03 Revised:2012-08-13 Online:2012-10-01 Published:2013-01-07

Abstract:

This paper introduced the structure characteristics of HD1080A half-speed steam turbine that was produced by DFSTW using the French Alstom technology, and studied the installation technology and procedure of the turbine, especially the key technologies of the adjustment for radial through-flow gap in high, intermediate and low pressure cylinder, the rotor center finding and the vibration isolator release. The Installation experience could be a reference for similar projects.