Calculation of Location Sag by Using Augmented Capacity Conductor

fd9dwl 5w3zc1 vckw7r

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (12) : 52-54.

PDF(549 KB)
PDF(549 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (12) : 52-54.

Calculation of Location Sag by Using Augmented Capacity Conductor

  • fd9dwl 2,5w3zc1 2,vckw7r 2
Author information +
History +

Abstract

The upgrading improvement by using augmented capacity conductor could alleviate the insufficient capacity problem of transmission lines. In spite of the significant capacity increase, the maximum temperature of conductors will exceed 80℃, thus it is inappropriate to use the sag calculated in the condition of 40℃, 50℃ or icing without wind to locate towers. The calculation method of location sag when using augmented capacity conductor is analyzed, and the verification according to examples is carried out.

Cite this article

Download Citations
fd9dwl 5w3zc1 vckw7r. Calculation of Location Sag by Using Augmented Capacity Conductor[J]. Electric Power Construction. 2012, 33(12): 52-54
PDF(549 KB)

Accesses

Citation

Detail

Sections
Recommended

/