Improvement of Grid Reliability of Sichuan Province by Using UHVDC Transmission System

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (4) : 24-27.

PDF(754 KB)
PDF(754 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (4) : 24-27.

Improvement of Grid Reliability of Sichuan Province by Using UHVDC Transmission System

Author information +
History +

Abstract

In order to transfer large capacity hydropower from west of Sichuan province to outside, State Power Grid Corporation plans to establish three-DC and two-AC UHV transmission line. The transmission capability from the west to the east and the interaction between AC and DC transmission system are analyzed, focusing on the study of how to using the advantages of UHVDC transmission system and the grid characteristics to improve the grid reliability of Sichuan province.

Cite this article

Download Citations
Improvement of Grid Reliability of Sichuan Province by Using UHVDC Transmission System[J]. Electric Power Construction. 2012, 33(4): 24-27
PDF(754 KB)

Accesses

Citation

Detail

Sections
Recommended

/