Analysis of Problems in Starting-up and Commissioning Process of 1 000 MW Ultra-supercritical Steam Turbine

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (5) : 93-96.

PDF(503 KB)
PDF(503 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (5) : 93-96.

Analysis of Problems in Starting-up and Commissioning Process of 1 000 MW Ultra-supercritical Steam Turbine

Author information +
History +

Abstract

Base on the units starting-up and commissioning process in a power plant, this paper introduced the structure characteristics and starting-up processs control technologies of 1 000 MW steam turbine with SIEMENS technology. Problems in starting-up and commissioning process were analyzed, and some proposal were put forward for the commissioning of 1 000 MW ultra-supercritical unit and the optimization of boiler steam-blowing, which could provide references for other units commissioning.

Cite this article

Download Citations
Analysis of Problems in Starting-up and Commissioning Process of 1 000 MW Ultra-supercritical Steam Turbine[J]. Electric Power Construction. 2012, 33(5): 93-96
PDF(503 KB)

Accesses

Citation

Detail

Sections
Recommended

/