Analysis on GIL Connection for Main Transformer and GIS

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (6) : 27-29.

PDF(485 KB)
PDF(485 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (6) : 27-29.

Analysis on GIL Connection for Main Transformer and GIS

Author information +
History +

Abstract

The application of gas-insulated line (GIL) connection was analyzed through techno-economic comparison, for the layout optimization of outdoor gas-insulated switchgear (GIS) substation. The result shows that this method has some advantages, such as economic in investment, little in occupy floor, reliable in connection, and it can promote the “resource conserving, environmental friendly and industrialized” substation construction. This paper put forward some proposals for the application of GIL connection, based on the deep analysis on the problems of using GIL connection during factory, handover preventive testing or maintenance.

Key words

substation / SF6 oil bushing / GIL connection

Cite this article

Download Citations
Analysis on GIL Connection for Main Transformer and GIS[J]. Electric Power Construction. 2012, 33(6): 27-29
PDF(485 KB)

Accesses

Citation

Detail

Sections
Recommended

/