Cableway Transportation for Heavy Component of Steel Tube Tower in 1 000 kV UHV Transmission Line (Huainan to Shanghai)

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (7) : 99-101.

PDF(511 KB)
PDF(511 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (7) : 99-101.

Cableway Transportation for Heavy Component of Steel Tube Tower in 1 000 kV UHV Transmission Line (Huainan to Shanghai)

Author information +
History +

Abstract

In order to solve the transportation difficulties in 1 000 kV UHV AC transmission engineering construction (Huainan to Shanghai), this paper put forward a transportation program of 2×multispan circulation cableway with double cable single type. According to the different load quantities, this cableway transportation program divided into independent mode, combined mode and split mode. The testing results show that the cableway transportation program is effective, which can provide reference for related projects.

Cite this article

Download Citations
Cableway Transportation for Heavy Component of Steel Tube Tower in 1 000 kV UHV Transmission Line (Huainan to Shanghai)[J]. Electric Power Construction. 2012, 33(7): 99-101
PDF(511 KB)

Accesses

Citation

Detail

Sections
Recommended

/