Reasonable Setting and Measured Groundwork Pit ofCorner Blocks in Transmission Lines Tension Stringing

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (8) : 106-109.

PDF(1213 KB)
PDF(1213 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (8) : 106-109.

Reasonable Setting and Measured Groundwork Pit ofCorner Blocks in Transmission Lines Tension Stringing

Author information +
History +

Abstract

It is difficult to arrange traction-tension space when transmission line lies in the mountains. The corner block is needed for the steering arrangement, under the situation that cannot arrange traction space or tension space in the line stringing center. The setting of corner block is important to the quality and safety of stringing construction. This paper investigated the method to determine the corner block’s numbers, location, and the ground anchor’s direction, according to the guidelines and practical engineering experience.

Cite this article

Download Citations
Reasonable Setting and Measured Groundwork Pit ofCorner Blocks in Transmission Lines Tension Stringing[J]. Electric Power Construction. 2012, 33(8): 106-109
PDF(1213 KB)

Accesses

Citation

Detail

Sections
Recommended

/