General Layout Optimization for Huaneng Haimen Power Plant

HuanHui XIAO

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (8) : 67-69.

PDF(1873 KB)
PDF(1873 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (8) : 67-69.

General Layout Optimization for Huaneng Haimen Power Plant

  • HuanHui XIAO
Author information +
History +

Abstract

The general layout plays a pivotal role for coal-fired power plants, whose investment accounts for 10%~15% of the whole project static investment. And the layout optimization has a great influence on the operation management costs. Huaneng Haimen Power Plant made more attempt on general layout than other power plants in coastal areas, such as the coal handling gallery through the chimney, drainage taking by open channel in a maximum extent, and so on, which could provide reference for related projects.

Cite this article

Download Citations
HuanHui XIAO. General Layout Optimization for Huaneng Haimen Power Plant[J]. Electric Power Construction. 2012, 33(8): 67-69
PDF(1873 KB)

Accesses

Citation

Detail

Sections
Recommended

/