Optimized Design of Comprehensive Gallery in CPR 1000 Nuclear Power Plant

Electric Power Construction ›› 2012, Vol. 33 ›› Issue (9) : 59-63.

PDF(747 KB)
PDF(747 KB)
Electric Power Construction ›› 2012, Vol. 33 ›› Issue (9) : 59-63.

Optimized Design of Comprehensive Gallery in CPR 1000 Nuclear Power Plant

Author information +
History +

Abstract

The comprehensive gallery of CPR 1000 nuclear power plant had already become an important influence factor of plant construction cost and schedule, due to the features of large scale, various interfaces and complex design cooperation. This paper introduced the design scope and content of gallery, pointed out the shortcomings of the traditional design method, chose the best combination mode of design schemes. The comparison selection and practical application prove that the method combined with detail type body design and active interface design is a strong practical optimized design method relative to previous conservative methods, because it can effectively optimize the arrangement of gallery to control construction cost, and improve the interface design efficiency to ensure construction schedule.

Cite this article

Download Citations
Optimized Design of Comprehensive Gallery in CPR 1000 Nuclear Power Plant[J]. Electric Power Construction. 2012, 33(9): 59-63
PDF(747 KB)

Accesses

Citation

Detail

Sections
Recommended

/