Calculation Model of Conductor Removed-length after Span Reconstruction While Large-span Tensioning on Ground

SUN Dexin

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (1) : 96-98.

PDF(380 KB)
PDF(380 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (1) : 96-98.

Calculation Model of Conductor Removed-length after Span Reconstruction While Large-span Tensioning on Ground

  • SUN Dexin
Author information +
History +

Abstract

The span reconstruction in the strain section is analyzed in this paper, which is caused by the inclination of suspension insulator strings in tangent tower, and then the calculation model is established. The calculation method of conductor removed-length is derived under the condition of large-span ground-tensioning. It is verified by practices that this model has higher calculation accuracy.

Key words

large-span / span reconstruction / suspension insulator string / inclination / tensioning on ground

Cite this article

Download Citations
SUN Dexin. Calculation Model of Conductor Removed-length after Span Reconstruction While Large-span Tensioning on Ground[J]. Electric Power Construction. 2013, 34(1): 96-98

References

[1] 黄克信.低弛度地面划印法——介绍500 kV平武线金口长江跨越紧线工艺技术[J].电力建设,1982,13(4):18-22.

[2]孙成国,陈世利.一牵二分次展放、低弛度地面画印法架线施工[J].吉林电力,2002(6):30-32.

[3]阮红兵,陈世利,孙成国.低弛度地面画印法架线施工线长调整计算[J].吉林电力,2003(1):35-37.

[4]邹俊,李祖元. 500 kV水布垭—潜江Ⅰ、Ⅱ回长江大跨越架线施工中弛度的控制[J]. 湖北电力,2008,32(4):11-13.

[5]孙德新. “耐—直—耐”跨越方式下导线弛度控制及地面划印割线计算[J].电力建设,2011,32(6):108-111.

[6] 王柏正.高空紧线技术在大跨越架线施工中的运用[J].电力建设,1994,25(2):32-34.

[7] 胡其秀.电力工程施工组织设计手册:送变电卷[M].北京:中国水利水电出版社,2004.

[8] 蔡生泉.高压架空输电线路张力架线[M].北京:水利电力出版社,1991.

[9] 邵天晓.架空送电线路电线力学计算[M].北京:中国电力出版社,2003.

[10] 李博之.高压架空输电线路施工技术手册:架线工程计算部分[M]. 北京:中国电力出版社,1998.