Discussion of Hoisting Method for DG3110/26.15 Ultra-Supercritical Once-through Boiler

HE Qingdong,DAI Youming

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (1) : 99-102.

PDF(727 KB)
PDF(727 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (1) : 99-102.

Discussion of Hoisting Method for DG3110/26.15 Ultra-Supercritical Once-through Boiler

  • HE Qingdong,DAI Youming
Author information +
History +

Abstract

The key hoisting technology for DG3110/26.15-Ⅱ1 once-through boiler of 2×1 000 MW units in the third stage extension project of Qinbei Power Plant is introduced in this paper. According to the boiler parameters, arrangement mode, and considering own mechanical resource of hoisting and process, safety, quality and cost in construction, a reasonable hoisting scheme is suggested, including the steel frame and heating surface components, which has been proved with beneficial effect. The experience also has referencial significance to the same type boiler hoisting.

Key words

ultra-supercritical units / boiler / steel frame / water wall / hoisting

Cite this article

Download Citations
HE Qingdong,DAI Youming. Discussion of Hoisting Method for DG3110/26.15 Ultra-Supercritical Once-through Boiler[J]. Electric Power Construction. 2013, 34(1): 99-102

References

[1]东方锅炉(集团)股份有限公司.锅炉安装说明书14S-M[G].德阳:东方锅炉(集团)股份有限公司,2009.

[2]郑州科润电机工程有限公司.FZQ-2400附壁吊车说明书及负荷表[G].郑州:国电郑州机械设计研究所,2007.

[3]利勃海尔公司.LR-1750履带吊说明书及负荷表[G].德国:利勃海尔公司,2008.

[4]河南第二火电建设公司.华能沁北电厂三期2×1 000  MW机组锅炉施工组织设计[G].郑州:河南第二火电建设公司,2009.

[5]冯志毅.锅炉安装常见要点及其质量控制要点[J].应用能源技术,2009(2):27-29.

[6]王运法.锅炉主力吊装机械的选择[J].水利电力机械,2007(1):46-49.

[7]河南第二火电建设公司.华能沁北电厂三期2×1 000  MW机组锅炉顶板梁吊装方案[R].郑州:河南第二火电建设公司,2010.

[8]锦峰,芮晓明,马晓勇.电站锅炉吊装干涉分析模型及其数据结构[J].现代电力,2002(3):33-36.

[9]河南第二火电建设公司.华能沁北电厂三期2×1 000  MW机组锅炉受热面吊装方案[R].郑州:河南第二火电建设公司,2010.

[10]中国电力建设企业协会.电力建设施工质量验收及评价规程:锅炉机组[S].北京:中国电力建设企业协会,2009.