Parallel Processing Technology of Monitoring Field Data in Intelligent Substation

LIANG Junbin, ZAHNG Wei, DENG Yurong, GUO Lijuan, LV Zecheng

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (2) : 35-40.

PDF(996 KB)
PDF(996 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (2) : 35-40.

Parallel Processing Technology of Monitoring Field Data in Intelligent Substation

  • LIANG Junbin, ZAHNG Wei, DENG Yurong, GUO Lijuan, LV Zecheng
Author information +
History +

Abstract

 

The construction of intelligent substation and the development of smart grid have put forward higher requirements to the intelligence of high-voltage electric equipments. The on-line monitoring and diagnosis technology is a critical part of intelligent substation construction, however, the conventional data processing methods now are difficult to satisfy the needs of monitoring, because of the large number of t monitoring types, the large amount of data processing, and the imperfect technology of structured communication between each level. Based on the summary of existing pretreatment technologies of field analysis for condition monitoring data, some cases of the integrated structure of communication network for condition monitoring data, the collection and sharing of terminal data, as well as the data transmission model after pretreatment are studied. Finally, some experience and improvement measures are presented for the optimization of parallel processing technology for condition monitoring data, in order to more reasonably realize the unified collection and process of condition monitoring data in intelligent substation, and provide help for the better analysis and use of monitoring data.

Key words

intelligent substation / condition monitoring data / integrated structure / collection sharing / transmission model

Cite this article

Download Citations
LIANG Junbin, ZAHNG Wei, DENG Yurong, GUO Lijuan, LV Zecheng. Parallel Processing Technology of Monitoring Field Data in Intelligent Substation[J]. Electric Power Construction. 2013, 34(2): 35-40

References

[1]王楠,陈志业,律方成,等. 电容型设备绝缘在线监测与诊断技术综述 [J].电网技术, 2003,27(8):72-75.

[2]张金江,郭创新,曹一家,等. 变电站设备状态监测系统及其IEC模型协调[J].电力系统自动化, 2009, 33(20):67-72.

[3]路广,张伯明,孙宏斌. 数据仓库和数据挖掘技术在电力系统中的应用 [J].电网技术, 2001,25(8):54-57.

[4]张涛,吴湘黔,赵立进, 等. 贵州电网输变电设备在线监测技术应用及规划 [J].贵州电力技术, 2011,14(3):1-7.

[5]DL/T 1146—2009 DL/T 860实施技术规范[S].北京:中国电力出版社,2009.

[6]左丽霞.基于DSP的高压电气设备绝缘在线监测系统设计[J].电力自动化设备,2011,31(10):144-147.

[7]袁红波,王红斌. 高压设备绝缘在线监测影响因素分析[J]. 华北电力技术,2002(6):41-43.

[8]葛遗莉,李广华,冯亚东,等.数字化变电站采样值传输协议分析[J].广东电力,2010,23(6):23-27.

[9]冯亚东,李彦,王松,等. IEC 61850-9-2点对点采样值传输在继电保护中的实现与应用[J]. 电力系统自动化,2012,36(2):82-85.

[10]朱一欣,戚军. 电力综合数据网建设分析[J]. 电力系统通信, 2010,31 (11):28-30.

[11]钱君霞,沈泓,霍雪松.江苏电网110、35 kV变电站电力调度数据网络的建设与实施[J].中国电力,2008,41(10):75-79.

[12]洪宪平.电力综合数据网的建设[J].中国电力,2000,33(2):61-64.

PDF(996 KB)