Prefabricated Installation Techniques for Quad-Bundle Jumpers
LU Guozhi, LI Conggang
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 102-106.
PDF(629 KB)
PDF(629 KB)
Prefabricated Installation Techniques for Quad-Bundle Jumpers
The quad -bundle jumpers are commonly used in 500 kV power transmission lines. With the increasing restriction of transmission line corridors, transmission lines need to steer clear of the residential areas and buildings, which may result in the increase of tension angle towers in the lines’ design as well as the increase of loads in jumper installation and construction. At present, the on-tower capacity relation method is widely applied in the jumper installation, which has low efficiency and huge aerial operation workload. With several project practices, it shows that with the length accurately calculated in design process, the jumper is pressed and marked in material station, and transported to the site for suspension installation, which can greatly improve the efficiency of construction, reduce the aerial workload, as well as ensure the esthetics of process.
tension angle tower / quad-bundle jumper / prefabricated installation / construction technique / points for attention
[1]李庆林.架空送电线路施工手册[M].北京:中国电力出版社,2002.
[2]DL/T 757—2009 耐张线夹[S].
[3]赵虎元.架空送电线路非直线塔跳线及间隙设置探讨[J].山西电力技术,1999(3):18-19.
[4]黄成云.500 kV输电线路耐张塔4-4跳线长度计算[J].电力建设,1997(4):26-32.
[5]丁广鑫.国家电网公司输变电工程标准工艺施工工艺示范手册[M].北京:中国电力出版社,2011.
[6]SDJ 226—1987 架空送电线路导线及避雷线液压施工工艺规程[S].
[7]GB/T 2338—2002 架空电力线路间隔棒技术条件和试验方法[S].
[8]DL/T 683—1999 电力金具产品型号命名方法[S].
[9]罗文学. 500 kV输电线路跳线引流安装[J].贵州电力技术,2003(10):19-21.
[10]GB 50233—2005 110~500 kV架空送电线路施工及验收规范[S].
[11]SDJJS2—1987 超高压架空输电线路张力架线施工工艺导则[S].
/
| 〈 |
|
〉 |