Retrofit of Vibration Elimination for Normal Drain Pipeline in HP Heater
FENG Dengle, DAI Feng,JIN Yong
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 71-73.
PDF(605 KB)
PDF(605 KB)
Retrofit of Vibration Elimination for Normal Drain Pipeline in HP Heater
The arrangement of normal drain pipeline in high pressure (HP) heater in a large thermal power unit is unreasonable, which results the vibration of drain pipeline occurred repeatedly and endangers the safety of equipment. Some retrofits are carried out for the normal drain pipeline according to its arrangement in HP heater, such as excluding the water in normal drain pipe by using static pressure difference and condenser vacuum at the initial period of units’ start-up, which could completely eliminate the pipeline vibration, as well as prevent the equipment damage accident caused by vibration. New units could be optimized designed without low-point and U-tube, which could radically eliminate the pipeline vibration caused by small interstage differential pressure.
high pressure heater / vibration of drain pipeline / retrofit technology
[1]JB/T 8190—1999高压加热器技术条件[S]. 北京,机械工业出版社,2000.
[2]DL/T 5366—2006 火力发电厂汽水管道应力计算技术规程[S]. 北京:中国电力出版社,2007:7.
[3]谢诞梅. 某电厂200 MW汽轮机高压加热器故障分析及对策[J]. 汽轮机技术,2003,45(5):316-318.
[4]赖汉贤.高压加热器疏水管道振动原因分析[J]. 华电技术,2009,31(5):11-12,15.
[5]蔡锡琮. 高压加热器[M]. 北京:水利电力出版社,1995:342.
[6]朱珂,赵军. 亚临界600 MW机组高压加热器退出故障分析及其对策[J]. 热力发电,2009,38(4):65-67.
[7]杨忠国,霍本茂. 超临界600 MW机组高压加热器缺陷探讨[J]. 黑龙江电力,2010,32(2):143-145.
[8]张建生,胡政,王艳. 500 MW汽轮机组高压加热器故障分析及对策[J]. 电站辅机,2006,99(4):15-17.
[9]王运民. 高压加热器投入率低原因与改进[J]. 汽轮机技术,2006,48(1):55-57.
/
| 〈 |
|
〉 |