Analysis on Influence Factors of Power Grid Equipment and Material Price

LU Yanchao,WEN Weining,ZHAO Biao,ZHENG Yan

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 74-78.

PDF(605 KB)
PDF(605 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (4) : 74-78.

Analysis on Influence Factors of Power Grid Equipment and Material Price

  • LU Yanchao,WEN Weining,ZHAO Biao,ZHENG Yan
Author information +
History +

Abstract

The frequent fluctuations of equipments and materials prices have serious influence on the investment and cost control in power grid project. In order to accurately grasp the trend of equipment prices and reasonably control the project cost, it has positive significance to research the influence factors on equipment prices. Combined with the equipment price and the bidding data, these factors are analyzed in this paper, which are divided into three types: policy factors, economic factors and enterprise behavior. The factors affected the equipment prices are mostly through two aspects: cost and profit. Finally, the factors influencing profits could be concluded in three aspects, supply-demand relationship, competition model and bidding strategy; while the cost is mainly concluded into raw material cost, labor cost, fixed cost, development cost and financing cost. The research could provide references for the reasonable control of project cost and the reduction of project investment risk.

Key words

   

power grid project
/ project cost / price of equipment and material / influential factors
power grid project
/ project cost / price of equipment and material / influential factors

Cite this article

Download Citations
LU Yanchao,WEN Weining,ZHAO Biao,ZHENG Yan. Analysis on Influence Factors of Power Grid Equipment and Material Price[J]. Electric Power Construction. 2013, 34(4): 74-78

References

[1]陈锦山. 试论500  kV输变电工程项目的投资控制[J]. 电力技术经济,2003,15(6):29-31.



[2]赵彦丽,刘秀娟. 输变电安装工程施工阶段影响工程造价的因素分析及对策[J]. 电力学报,2008,6(23):212-214.



[3]崔万福,郑燕,卢玉,等. 吉林省2010年新建变电工程造价分析[J]. 能源技术经济,2012,24(1):42-46.



[4]李敬如,赵彪,史雪飞,等. 输变电工程综合造价指数分析方法[J]. 能源技术经济,2010,22(1):36-39.



[5]卢艳超,郑燕,赵彪. 输变电工程外部环境影响分析[J]. 中国电力,2012,45(10):100-103.



[6]张俊波,刘丽玲. 电网工程建设全过程造价管理与控制[J]. 中国科技信息,2012,15(8):62-63,64.



[7]王绵斌,黄毅臣,谭忠富,等. 基于工程量管理的施工图管理预算[J]. 电力建设,2011,32(1):99-104.



[8]徐志凡,侯丽丽. 基于模糊聚类最大树算法的电网建设项目造价风险的关键因素识别[J]. 现代电力,2011,28(3):90-94.



[9]谢传胜,董达鹏,徐欣. 基于粗糙集的电网项目造价控制关键因素识别[J]. 水电能源科学,2011(9):192-194.



[10]欧传龙. 电网规划对电网工程造价的影响[J]. 现代经济信息,2010(3):183.

PDF(605 KB)

Accesses

Citation

Detail

Sections
Recommended

/