Commissioning Test of Stop Valve and Control Valve for Semi-speed Steam Turbine in 1 119 MW Nuclear Power Plant

SUN Xiaolong, ZHAO Shuyu

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (5) : 62-65.

PDF(648 KB)
PDF(648 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (5) : 62-65.

Commissioning Test of Stop Valve and Control Valve for Semi-speed Steam Turbine in 1 119 MW Nuclear Power Plant

  • SUN Xiaolong, ZHAO Shuyu
Author information +
History +

Abstract

This paper introduces the layout and structure characteristics of stop valves and control valves of No.1 steam turbine in Hongyanhe Nuclear Power Plant, as well as the valves’ commissioning process, including setting of valve position feedback, the adjustment and calibration of valve switching time, step response test. Finally, some important technical indexes were analyzed to give adjustment methods, which could provide references for similar projects’ commissioning.

Key words

nuclear power plant / steam turbine / stop valve / control valve / commissioning

Cite this article

Download Citations
SUN Xiaolong, ZHAO Shuyu. Commissioning Test of Stop Valve and Control Valve for Semi-speed Steam Turbine in 1 119 MW Nuclear Power Plant[J]. Electric Power Construction. 2013, 34(5): 62-65

References

[1]东方汽轮机有限公司. Equipment operation & maintenance manual-stop & modulating valve with hydraulic actuator[G]. 成都:东方汽轮机有限公司,2011.


[2]邓庆松.汽轮机调节阀门波动的原因分析[J].中国电力, 2004,37 (7):69-70.

[3]应光耀,黄勇. 西门子1 000 MW机组DEH汽门调整试验[J].浙江电力, 2009(4): 44-47.

[4]DL/T 711—1999汽轮机调节控制系统试验导则[S].

[5]黄振鸣. 略谈汽轮机的执行机构[J].发电设备,1991(1):7-11.

[6]东方汽轮机有限公司. Turbine steam inlet valves equipment operation and maintenance manual[G]. 成都:东方汽轮机有限公司,2011.

[7]东方汽轮机有限公司. HP油动机及操纵座运行维护手册[G]. 成都:东方汽轮机有限公司, 2008.

[8]崔洋,宋明明,刘波. 汽轮机调节阀伺服卡中积分环节对控制系统的影响[J].产业与科技论坛,2011(21):106-107.

[9]包锦华,黄勇. 1 000 MW超超临界机组汽轮机DEH调试简介[J]. 热力透平,2008,37 (12):289-291.

[10]朱丹书.核电汽轮机阀门的动态分析[J]. 汽轮机技术,1996,38 (8):221-235.