Development of Light Manned-Type Climbing Tower Equipment

LI Xuebin,WANG Zhijun,YANG Junning,FU Ran

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (6) : 78-81.

PDF(950 KB)
PDF(950 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (6) : 78-81.

Development of Light Manned-Type Climbing Tower Equipment

  • LI Xuebin,WANG Zhijun,YANG Junning,FU Ran
Author information +
History +

Abstract

As the UHV power transmission towers are high tower, with the height mostly between 50-150 m, the existing manned-type climbing tower equipments only can meet the requirement of large-crossing towers. Aimed to the maintenance requirement of medium and high towers of UHV power transmission, light manned-type climbing tower equipment was developed, with which the performance and security have passed the test detection and met design requirements. Compared with the existing climbing tower equipments, the new climbing tower equipment is more convenient and economic, as well as suitable for the climbing work of medium and high UHV power transmission towers.

Key words

power transmission line / tower / guide frame / climbing tower equipment

Cite this article

Download Citations
LI Xuebin,WANG Zhijun,YANG Junning,FU Ran. Development of Light Manned-Type Climbing Tower Equipment[J]. Electric Power Construction. 2013, 34(6): 78-81

References

[1]刘振亚.特高压电网[M].北京:中国经济出版社,2005:27.

[2]舒印彪,胡毅.特高压交流输电线路的运行维护与带电作业[J].高电压技术,2007,33(6):1-5.

[3]冯晓红.输电线路维护检修专用铁塔攀爬机研究与应用[J].电力建设,2009,30(8): 123-126.

[4]DL/T 5154—2002 架空送电线路杆塔结构设计技术规定[S].北京:中国电力出版社,2002.

[5]GB 50017—2003 钢结构设计规范[S].北京:中国计划出版社,2003.

[6]张志文.起重机设计手册[M].北京:中国铁道出版社,1998:502-578.

[7]陈绍蕃.钢结构设计原理[M].北京:科学出版社,2005:123-170.

[8]DS SolidWorks公司.SolidWorks Simulation 基础教程[M].北京:机械工业出版社,2010:11-48.

[9]GB/T 10054—2005 施工升降机[S].北京:中国计划出版社,2005.

[10]GB/T 10055—2005 施工升降机安全规程[S].北京:中国计划出版社,2005.

[11]TSG Q7008—2007 升降机型式试验细则[S].北京:中国计量出版社,2007.