Application of QST-100 Double Horizontal Arm Ground Holding Poles in Steel Tube Tower Assembly and Erection in “Anhui Electricity Eastward Transmitting” Project

ZENG Shengwei, ZHAO Shixing, LU Dangsheng, YUAN Xiaoling

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (6) : 98-103.

PDF(625 KB)
PDF(625 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (6) : 98-103.

Application of QST-100 Double Horizontal Arm Ground Holding Poles in Steel Tube Tower Assembly and Erection in “Anhui Electricity Eastward Transmitting” Project

  • ZENG Shengwei, ZHAO Shixing, LU Dangsheng, YUAN Xiaoling
Author information +
History +

Abstract

With the rapid development of 1 000 kV UHV projects, steel tube towers are widely used in projects. The steel tube towers in “Anhui Electricity Eastward Transmitting” project have the characteristics of big, long, heavy, etc., so the assembly and erection construction is rather difficult. In order to ensure the safety of project construction, it is necessary to find safe, efficient and economic construction methods and hoisting equipments. The QST-100 double horizontal arm ground holding poles were used in projects which could successfully solve the problem of difficult assembly and erection of steel tube tower. Finally, through the introduction of holding poles' performance and hoisting process, as well as the comparison with conventional construction methods, the superiority of holding poles were verified, which were worth of popularization and application in follow-up projects.

Key words

ground holding poles / steel tube tower / assembly and erection / project application

Cite this article

Download Citations
ZENG Shengwei, ZHAO Shixing, LU Dangsheng, YUAN Xiaoling. Application of QST-100 Double Horizontal Arm Ground Holding Poles in Steel Tube Tower Assembly and Erection in “Anhui Electricity Eastward Transmitting” Project[J]. Electric Power Construction. 2013, 34(6): 98-103

References

 [1]Q/GDW 346—2009架空输电线路钢管塔组立施工工艺导则[S]. 北京:中国电力出版社,2009.


[2]李博之.500 kV输电线路施工技术[M].北京:中国电力出版社,1999.

[3]李庆林.架空送电线路施工手册[M].北京:中国电力出版社,2002.

[4]李庆林.架空送电线路铁塔组立工程手册[M].北京:中国电力出版社,2007.

[5]建筑施工手册编写组.建筑施工手册[M].2版.北京:中国建筑出版社,1988.

[6]尚大伟.高压架空输电线路施工操作指南[M].北京:中国电力出版社,2007.

[7]架空输电线路施工工艺通用技术手册编写组. 架空输电线路施工工艺通用技术手册[M].北京:中国电力出版社,2012.

[8]李庆林.电力建设安全规程 第2部分:架空电力线路培训手册[M].北京:中国电力出版社,2005.

[9]Q/GDW 153—2006 1 000 kV架空送电线路施工及验收规范[S]. 北京:中国电力出版社,2007.

[10]GB 26859—2011电力安全工作规程 电力线路部分[S]. 北京:中国标准出版社,2011.
PDF(625 KB)

Accesses

Citation

Detail

Sections
Recommended

/