Abstract

 

In 2009, State Grid Corporation of China proposed the development goal of building a strong smart grid, and arranged 47 pilot projects of smart substations in 2 batches, of which 41 smart substations had been completed and put into operation by the end of 2011. The key technologies and equipments applied in these 41 pilot projects of smart substations were introduced, with the problems in the pilots’ construction sorted out, and the experience of construction design summed up, which would be of great significance to the construction of smart substation in future.

Key words

smart substation / pilot project / key technology / equipment

Cite this article

Download Citations
SONG Xuankun, YAN Peili, WU Lei,LI Jun,ZOU Guohui. Review of Key Technology for Smart Substation Pilot Projects[J]. Electric Power Construction. 2013, 34(7): 10-16

References

 


[1]国家电网公司.智能变电站试点工程评价报告[R].北京:国家电网公司,2011.

[2]国家电网公司. Q/GDW 383—2009 智能变电站技术导则[S]. 北京:中国电力出版社,2009.

[3]国家电网公司. Q/GDW Z 410—2010 高压设备智能化技术导则[S]. 北京:中国电力出版社,2010.

[4]国家电网公司. Q/GDW 441—2010 智能变电站继电保护技术规范[S]. 北京:中国电力出版社,2010.

[5]国家电网公司. 国家电网公司输变电工程通用设计:110(66)~750 kV智能变电站部分(2011年版)[M]. 北京:中国电力出版社,2010.

[6]刘有为,邓彦国,吴立远. 高压设备智能化方案及技术特征[J]. 电网技术,2010,34(7):1-4.

[7]王勇,曹保定,姜涛. 电子式互感器合并单元的快速数据处理[J]. 电网技术,2009,33(1):87-91.

[8]李仲青,周泽昕,黄毅,等. 数字化变电站继电保护适应性研究[J]. 电网技术,2011, 35(5):210-215.

[9]国网北京经济技术研究院.变电站二次系统整合方案研究报告[R].北京: 国网北京经济技术研究院,2011.  

PDF(653 KB)

Accesses

Citation

Detail

Sections
Recommended

/