Construction Technique for Long Distance River-Crossing  Cable with Extra Cross-Sectional Size

HOU Lingao,FENG Jubin,LIU Zhentao

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (7) : 122-128.

PDF(1448 KB)
PDF(1448 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (7) : 122-128.

Construction Technique for Long Distance River-Crossing  Cable with Extra Cross-Sectional Size

  • HOU Lingao,FENG Jubin,LIU Zhentao
Author information +
History +

Abstract

Taking the project of Shizimen Channel crossing part of 220 kV Qinyun (Zhuhai)-Lianhua (Macao) Power Transmission line (Lot-3) as an example, the construction technique for long distance river-crossing cable with extra cross-sectional size cable laying inside pipeline was introduced. Firstly, horizontal directional drilling machine was used to cross the river channel, then protective pipeline was laid for cable and high-power hydraulic puller was used as the pulling machine; at the same time cable support with brake equipment was used as the supporting device for transmission cable laying. Compared with the conventional construction method that only uses manual maneuvering winch as single power, the construction method that uses high-power hydraulic puller in cable laying is more safe, economic, and effective.

Key words

crossing pipe laying / cable laying / extra cross-sectional size cable / long distance / hydraulic puller

Cite this article

Download Citations
HOU Lingao,FENG Jubin,LIU Zhentao. Construction Technique for Long Distance River-Crossing  Cable with Extra Cross-Sectional Size[J]. Electric Power Construction. 2013, 34(7): 122-128

References

 


 


[1]GB 50217—2007电力工程电缆设计规范[S]. 北京:中国计划出版社,2008.

 


[2]郑少鹏. 大型电站工程电缆设计与施工的一些方法[J]. 电力建设,2004,25(2):5-6.

 


[3]CSTT 水平定向钻进管线铺设工程技术规范[S]. 北京:中国计划出版社,2008.

 


[4]GB5 0424—2007油气输送管道穿越工程施工规范[S]. 北京:中国计划出版社,2008.

 


[5]徐瑞.220 kV华月线过河电缆隧道工程技术研究[J].城市建设理论研究, 2011(16):7-8.

 


[6]侯旭.刍议220 kV高压电缆施工技术[J].城市建设理论研究, 2011(30):70.

 


[7]GB 50168—2006电气装置安装工程电缆线路施工及验收规范[S].北京:中国计划出版社,2006.

 


[8]DL/T 5161—2002电气装置安装工程质量检验及评定规程[M].北京:中国电力出版社,2002.

 


[9]GB5 0303—2011建筑电气工程施工质量验收规范[S].北京:中国计划出版社,2011.

 


[10]GB 50169—2006电气装置安装工程接地装置施工及验收规范[S].北京:中国计划出版社,2006.

 


[11]GB 50150—2006电气装置安装工程电气设备交接试验标准[S].北京:中国计划出版社,2006.

 


[12]祝燕萍.浅谈110 kV电缆敷设的施工措施及要点分析[J].城市建设理论研究,2012(33):10-11.
PDF(1448 KB)

Accesses

Citation

Detail

Sections
Recommended

/