• CSCD核心库收录期刊
  • 中文核心期刊
  • 中国科技核心期刊

ELECTRIC POWER CONSTRUCTION ›› 2013, Vol. 34 ›› Issue (7): 43-47.

Previous Articles     Next Articles

 
Planning and Location Scheme of Zhejiang UHV AC/DC Hybrid System

CHEN Jie1, NING Kanghong1, LI Yang2   

  1. 1.    Zhejiang Electric Power Design Institute, Hangzhou 310012, China; 2.      Zhejiang Electric Power Dispatching and Communication Center, Hangzhou 310000, China
  • Online:2013-07-01

Abstract:

On the basis of national UHV power grid planning and Zhejiang power grid planning, the power supply area, planning location and rationality of UHV AC/DC stations were analyzed, and an adjustment and optimization scheme for Zhejiang main grid by locating at Zhezhong and Ningdong was proposed, combined with the basic situation of power consumption forecast and power balance in Zhejiang Province. Finally, the technical and economic comparison and analysis were carried out on the different location schemes of Zhejiang UHV AC/DC hybrid systems.