Discussion on Relay Protection Strategy During Integrated Starting of Large Generating Units

NIU Litao,XIAO Guixia,WU Pengyue,HE Xinlin

Electric Power Construction ›› 2013, Vol. 34 ›› Issue (7) : 89-94.

PDF(671 KB)
PDF(671 KB)
Electric Power Construction ›› 2013, Vol. 34 ›› Issue (7) : 89-94.

Discussion on Relay Protection Strategy During Integrated Starting of Large Generating Units

  • NIU Litao1,XIAO Guixia2,WU Pengyue1,HE Xinlin1
Author information +
History +

Abstract

 

The condition of generator-transformer system in electrical tests during integrated starting is different from that in normal operation. The characteristics of different test stages were discussed based on the electrical test process in integrated starting of practical generating units. Aimed to the problems occurred in integrated starting process, some relay protection strategies were suggested for electric start-up, such as fixed value setting basis of temporary power supply of excitation transformer, adjustment principle of setting value used for generator synchronization, protection switching principle. These strategies will provide references for the integrated starting of large generating units.

Key words

 integrated starting / synchronization / setted value calculation / short circuit test / no-load test

Cite this article

Download Citations
NIU Litao,XIAO Guixia,WU Pengyue,HE Xinlin. Discussion on Relay Protection Strategy During Integrated Starting of Large Generating Units[J]. Electric Power Construction. 2013, 34(7): 89-94

References

 


 


[1]师敬波,贾廷伟.发电机零起升压匝间短路保护动作分析与处理 [J]. 电力科学与工程,2010,26(2):76-78.

 


[2]吴建福,周移华.发电机定子接地保护动作分析及防范措施[J]. 电力系统保护与控制,2010,38(5):111-114.

 


[3]肖仕武,刘万顺,屠黎明,等. 同步发电机定子内部故障暂态过程及对保护的影响[J]. 电力系统自动化,2003,27(23):63-66.

 


[4]兀鹏越,张磊,何信林,等. 由一起事故看励磁实验电源选择计算的误区[J]. 华北电力技术,2012,24(3):42-46.

 


[5]张保会,尹项根. 电力系统继电保护[M]. 北京:中国电力出版社,2005:45-51.

 


[6]刘巍. 机组准同期并网应注意的问题[J]. 河南电力,2008,27(2):25-28.

 


[7]金崇光.发电机误上电保护配置及改进措施[J]. 电力系统保护与控制,2008,36(15):74-77.

 


[8]郑立,李群炬,梁玉芝,等. 发电机-变压器组500 kV断路器断口闪络故障分析[J]. 中国电力,2010,43(2):31-35.

 


[9]兀鹏越,胡任亚,陈飞文,等. 1 036 MW机组的电气整套启动调试[J]. 电力建设,2010,31(7):77-80.

 


[10]孙刚虎,兀鹏越,牛利涛,等. 火电机组电气启动实验中的问题及处理[J]. 电力建设,2012,33(7):55-59.  
PDF(671 KB)

Accesses

Citation

Detail

Sections
Recommended

/