[1] |
于群, 张静, 屈玉清, 等. 基于ARMA-GABP 组合模型的电网大停电事故损失负荷预测[J]. 中国电力, 2018, 51(11): 38-44.
|
|
YU Qun, ZHANG Zheng, QU Yuqing, et al. Power loss prediction of large blackouts in power grid based on ARMA-GABP combined model [J]. Electric Power, 2018, 51(11): 38-44.
|
[2] |
周博文, 陈麒宇, 杨东升. 巴西大停电的思考[J]. 发电技术, 2018, 39(2): 97-105.
|
|
ZHOU Bowen, CHEN Qiyu, YANG Dongsheng. On the power system large-scale blackout in Brazil [J]. Power Generation Technology, 2018, 39(2): 97-105.
|
[3] |
范明天, 刘思革, 张祖平, 等. 城市供电应急管理研究与展望[J]. 电网技术, 2007, 31(10): 38-41.
|
|
FAN Mingtian, LIU Sige, ZHANG Zuping, et al. A research and review on the emergency management of power supply in urban power network[J]. Power System Technology, 2007, 31(10): 38-41.
|
[4] |
朱朝阳, 于振, 刘超. 电力应急管理理论与技术体系研究[J]. 电网技术, 2011, 35(2): 178-182.
|
|
ZHU Chaoyang, YU Zhen, LIU Chao. Research on theory and technical system for power emergency management[J]. Power System Technology, 2011, 35(2): 178-182.
|
[5] |
张爱国, 郝建刚, 唐志芳, 等. 考虑综合负荷重要性的移动应急电源容量优化分配[J]. 电网技术, 2008, 32(S2): 86-89.
|
|
ZHANG Aiguo, HAO Jiangang, TANG Zhifang, et al. The allocation scheme of mobile emergency generator considering the loads importance [J]. Power System Technology, 2008, 32(S2): 86-89.
|
[6] |
罗华峰, 房鑫炎, 俞国勤. 考虑负荷顺位的电力应急资源调度模型[J]. 中国电力, 2013, 46(9): 107-111.
|
|
LUO Huafeng, FANG Xinyan, YU Guoqin. Power emergency resources allocation schedule model considering the sequence of loads[J]. Electric Power, 2013, 46(9): 107-111.
|
[7] |
王宏, 林振智, 文福拴, 等. 城市移动应急电源的优化调度[J]. 电力系统自动化, 2014, 38(3): 123-129.
|
|
WANG Hong, LIN Zhenzhi, WEN Fushuan, et al. Optimal scheduling of urban mobile emergency power sources[J]. Automation of Electric Power Systems, 2014, 38(3): 123-129.
|
[8] |
区伟健, 房鑫炎, 俞国勤, 等. 考虑时间分级的移动应急电源优化配置模型[J]. 电力系统及其自动化学报, 2015, 27(7): 60-66.
|
|
OU Weijian, FANG Xinyan, YU Guoqin, et al. Optimal allocation model of mobile emergency power supply considering time classification strategy[J]. Proceedings of the CSU-EPSA, 2015, 27(7): 60-66.
|
[9] |
黄裕春, 王宏, 文福拴. 含区间数的电力应急网络最优调度路径的确定[J]. 电力系统及其自动化学报, 2015, 27(1): 19-25.
|
|
HUANG Yuchun, WANG Hong, WEN Fushuan. Determining of optimal scheduling path in power emergency support network represented by interval values[J]. Proceedings of the CSU-EPSA, 2015, 27(1): 19-25.
|
[10] |
赵明宇, 徐石明, 高辉, 等. 基于模糊K-means算法的电动汽车应急供电策略[J]. 电力系统自动化, 2016, 40(5): 91-95, 108.
|
|
ZHAO Mingyu, XU Shiming, GAO Hui, et al. Strategy of electric vehicle emergency power supply based on fuzzy K-means algorithm[J]. Automation of Electric Power Systems, 2016, 40(5): 91-95, 108.
|
[11] |
杨舒婷, 谢宁, 王赛一, 等. 基于不同用户需求的移动应急电源优化配置[J]. 电力系统保护与控制, 2017, 45(6): 115-119.
|
|
YANG Shuting, XIE Ning, WANG Saiyi, et al. Mobile emergency power optimal configuration based on different users' demand[J]. Power System Protection and Control, 2017, 45(6): 115-119.
|
[12] |
韩畅, 梁博淼, 林振智, 等. 防灾应急电源优化调度的机会约束规划方法[J]. 电力自动化设备, 2018, 38(3): 147-154.
|
|
HAN Chang, LIANG Bomiao, LIN Zhenzhi, et al. Chance-constrained programming method for optimal scheduling of emergency power source[J]. Electric Power Automation Equipment, 2018, 38(3): 147-154.
|
[13] |
钱峰, 冯昌森, 文福拴, 等. 计及安全约束的机组最优组合鲁棒优化方法[J]. 电力建设, 2017, 38(4): 18-25.
|
|
QIAN Feng, FENG Changsen, WEN Fushuan, et al. Robust optimization based security-constrained unit commitment[J]. Electric Power Construction, 2017, 38(4): 18-25.
|
[14] |
王志奎, 孙磊, 林振智, 等. 计及负荷和调配时间不确定性的防灾应急电源优化配置[J]. 电力系统自动化, 2018, 42(2): 34-41.
|
|
WANG Zhikui, SUN Lei, LIN Zhenzhi, et al. Optimal allocation of emergency power sources considering uncertainties of loads and dispatching time periods [J]. Automation of Electric Power systems, 2018, 42(2): 34-41.
|
[15] |
高峰记. 可能度及区间数综合排序[J]. 系统工程理论与实践, 2013, 33(8): 2033-2040.
|
|
GAO Fengji. Possibility degree and comprehensive priority of interval numbers[J]. Systems Engineering-Theory & Practice, 2013, 33(8): 2033-2040.
|
[16] |
CHINNECK J W, RAMADAN K. Linear programming with interval coefficients[J]. Journal of the Operational Research Society, 2000, 51(2): 209-220.
|
[17] |
魏明奎, 周全, 周泓, 等.基于两阶段鲁棒优化的西南地区微电网经济调度[J].中国电力, 2019,52(11):2-8,18.
|
|
WEI Mingkui, ZHOU Quan, ZHOU Hong,et al. Economic dispatch of microgrid in southwest China based on two-stage robust optimization [J]. Electric Power, 2019,52(11):2-8,18.
|
[18] |
LI M, GABRIEL S A, SHIM Y, et al. Interval uncertainty-based robust optimization for convex and non-convex quadratic programs with applications in network infrastructure planning[J]. Networks and Spatial Economics, 2011, 11(1): 159-191.
|