Monthly
ISSN 1000-7229
CN 11-2583/TM
ELECTRIC POWER CONSTRUCTION ›› 2021, Vol. 42 ›› Issue (6): 105-115.doi: 10.12204/j.issn.1000-7229.2021.06.011
• Smart Grid • Previous Articles Next Articles
SUN Ruijuan1, LIANG Jun1,2, WANG Kewen1, WANG Yaoqiang1
Received:
2020-12-31
Online:
2021-06-01
Published:
2021-05-28
Supported by:
CLC Number:
SUN Ruijuan, LIANG Jun, WANG Kewen, WANG Yaoqiang. Overview of Offshore Wind Power Collection System[J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(6): 105-115.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.cepc.com.cn/EN/10.12204/j.issn.1000-7229.2021.06.011
[1] |
WANG Q, YU Z P, YE R, et al. An ordered curtailment strategy for offshore wind power under extreme weather conditions considering the resilience of the grid[J]. IEEE Access, 2019,7:54824-54833.
doi: 10.1109/Access.6287639 URL |
[2] | 张静, 高冲, 许彬, 等. 海上风电直流并网工程用新型柔性直流耗能装置电气设计研究[J/OL]. 中国电机工程学报. (2020-12-17) [2020-12-25]. https://doi.org/10.13334/j.0258-8013.pcsee.201275. |
ZHANG Jing, GAO Chong, XU Bin, et al. Research on electrical design of novel flexible DC energy consuming device for offshore wind power DC grid connection project[J/OL]. Proceedings of the CSEE. (2020-12-17) [2020-12-25]. https://doi.org/10.13334/j.0258-8013.pcsee.201275. | |
[3] | Global Wind Energy Concil. Global wind report 2019[R]. GWEC, 2020. |
[4] | 时智勇, 王彩霞, 李琼慧. “十四五”中国海上风电发展关键问题[J]. 中国电力, 2020,53(7):8-17. |
SHI Zhiyong, WANG Caixia, LI Qionghui. Key issues of China’s offshore wind power development in the“14th Five-Year Plan”[J]. Electric Power, 2020,53(7):8-17. | |
[5] | 王秀丽, 赵勃扬, 黄明煌, 等. 大规模深远海风电送出方式比较及集成设计关键技术研究[J]. 全球能源互联网, 2019,2(2):138-145. |
WANG Xiuli, ZHAO Boyang, HUANG Minghuang, et al. Research of integration methods comparison and key design technologies for large scale long distance offshore wind power[J]. Journal of Global Energy Interconnection, 2019,2(2):138-145. | |
[6] |
PÉREZ-RÚA J A, CUTULULIS N A. Electrical cable optimization in offshore wind farms: A review[J]. IEEE Access, 2019,7:85796-85811.
doi: 10.1109/Access.6287639 URL |
[7] | Wind Europe. Offshore wind in Europe: Key trends and statistics 2019[R]. Brussels,Belgium: Wind Europe, 2020. |
[8] | Rethink Energy. Offshore wind to drive 8m jobs,is key to decarbonization[R/OL]. Rethink Energy, 2020[2020-12-15]. https://rethinkresearch.biz/report/offshore-wind-to-drive-8m-jobs-is-key-to-decarbonization/. |
[9] | 陈宁. 大型海上风电场集电系统优化研究[D]. 上海: 上海电力学院, 2011. |
CHEN Ning. Large-scale offshore wind farm electrical collection systems optimization[D]. Shanghai: Shanghai University of Electric Power, 2011. | |
[10] | 王锡凡, 王碧阳, 王秀丽, 等. 面向低碳的海上风电系统优化规划研究[J]. 电力系统自动化, 2014,38(17):4-13, 19. |
WANG Xifan, WANG Biyang, WANG Xiuli, et al. Study of optimal planning methods for offshore wind power systems oriented low-carbon[J]. Automation of Electric Power Systems, 2014,38(17):4-13, 19. | |
[11] | 孙君洋, 朱淼, 高强, 等. 大型海上交流风电场内部拓扑优化设计[J]. 电网技术, 2013,37(7):1978-1982. |
SUN Junyang, ZHU Miao, GAO Qiang, et al. Optimal design of internal topology for high power AC offshore wind farms[J]. Power System Technology, 2013,37(7):1978-1982. | |
[12] |
QUINONEZ-VARELA G, AULT G W, ANAYA-LARA O, et al. Electrical collector system options for large offshore wind farms[J]. IET Renewable Power Generation, 2007,1(2):107-114.
doi: 10.1049/iet-rpg:20060017 URL |
[13] |
MUSASA K, NWULU N I, GITAU M N, et al. Review on DC collection grids for offshore wind farms with high-voltage DC transmission system[J]. IET Power Electronics, 2017,10(15):2104-2115.
doi: 10.1049/pel2.v10.15 URL |
[14] |
BAHIRAT H J, MORK B A. Operation of DC series-parallel connected offshore wind farm[J]. IEEE Transactions on Sustainable Energy, 2019,10(2):596-603.
doi: 10.1109/TSTE.5165391 URL |
[15] |
CHUANGPISHIT S, TABESH A, MORADI-SHAHRBABAK Z, et al. Topology design for collector systems of offshore wind farms with pure DC power systems[J]. IEEE Transactions on Industrial Electronics, 2014,61(1):320-328.
doi: 10.1109/TIE.2013.2245619 URL |
[16] | 江道灼, 谷泓杰, 尹瑞, 等. 海上直流风电场研究现状及发展前景[J]. 电网技术, 2015,39(9):2424-2431. |
JIANG Daozhuo, GU Hongjie, YIN Rui, et al. Research status and developing prospect of offshore wind farm with pure DC systems[J]. Power System Technology, 2015,39(9):2424-2431. | |
[17] |
ZHANG H B, GRUSON F RODRIGUEZ D M F, et al. Overvoltage limitation method of an offshore wind farm with DC series-parallel collection grid[J]. IEEE Transactions on Sustainable Energy, 2019,10(1):204-213.
doi: 10.1109/TSTE.2018.2829929 URL |
[18] | 袁兆祥, 仇卫东, 齐立忠. 大型海上风电场并网接入方案研究[J]. 电力建设, 2015,36(4):123-128. |
YUAN Zhaoxiang, QIU Weidong, QI Lizhong. Grid connected solution for large offshore wind farm[J]. Electric Power Construction, 2015,36(4):123-128. | |
[19] | GIDDANI O A, ADAM G P, LO K L, et al. Grid integration of offshore wind farms using multi-terminal DC transmission systems (MTDC)[C]// 5th IET International Conference on Power Electronics, Machines and Drives (PEMD 2010). Brighton, UK: Institution of Engineering and Technology, 2010. |
[20] |
RONG F, WU G P, LI X, et al. ALL-DC offshore wind farm with series-connected wind turbines to overcome unequal wind speeds[J]. IEEE Transactions on Power Electronics, 2019,34(2):1370-1381.
doi: 10.1109/TPEL.2018.2834965 URL |
[21] | 王建东, 李国杰. 考虑电缆故障时海上风电场电气系统开关配置方案的经济性比较与分析[J]. 电网技术, 2010,34(2):125-128. |
WANG Jiandong, LI Guojie. Economic study on switchgear configuration in electrical systems of offshore wind farms with cable outage[J]. Power System Technology, 2010,34(2):125-128. | |
[22] | 谭任深, 杨苹, 贺鹏, 等. 考虑电气故障和开关配置方案的海上风电场集电系统可靠性及灵敏度研究[J]. 电网技术, 2013,37(8):2264-2270. |
TAN Renshen, YANG Ping, HE Peng, et al. Analysis on reliability and sensitivity of collection system of offshore wind farms considering electrical faults and switchgear configurations[J]. Power System Technology, 2013,37(8):2264-2270. | |
[23] |
NAMI A, RODRIGUEZ-AMENEDO J L, ARNALTES S, et al. Frequency control of offshore wind farm with diode-recpngier-based HVdc connection[J]. IEEE Transactions on Energy Conversion, 2020,35(1):130-138.
doi: 10.1109/TEC.60 URL |
[24] |
DAHMANI O, BOURGUET S, MACHMOUM M, et al. Optimization of the connection topology of an offshore wind farm network[J]. IEEE Systems Journal, 2015,9(4):1519-1528.
doi: 10.1109/JSYST.2014.2330064 URL |
[25] | 魏书荣, 符杨, 黄玲玲. 大型海上风电场中压集电系统拓扑结构的优化方法[J]. 上海电力学院学报, 2015,31(3):201-205,213. |
WEI Shurong, FU Yang, HUANG Lingling. Topological optimization method of the electric power collection system for an offshore wind farm[J]. Journal of Shanghai University of Electric Power, 2015,31(3):201-205,213. | |
[26] |
HOU P, HU W H, SOLTANI M, et al. Offshore wind farm layout design considering optimized power dispatch strategy[J]. IEEE Transactions on Sustainable Energy, 2017,8(2):638-647.
doi: 10.1109/TSTE.2016.2614266 URL |
[27] |
PÉREZ-RÚA J A, STOLPE M, DAS K, et al. Global optimization of offshore wind farm collection systems[J]. IEEE Transactions on Power Systems, 2020,35(3):2256-2267.
doi: 10.1109/TPWRS.59 URL |
[28] |
DUTTA S, OVERBYE T J. Optimal wind farm collector system topology design considering total trenching length[J]. IEEE Transactions on Sustainable Energy, 2012,3(3):339-348.
doi: 10.1109/TSTE.2012.2185817 URL |
[29] |
DOMÍNGUEZ-GARCÍA J L, ROGERS D J, UGALDE-LOO C E, et al. Effect of non-standard operating frequencies on the economic cost of offshore AC networks[J]. Renewable Energy, 2012,44:267-280.
doi: 10.1016/j.renene.2012.01.093 URL |
[30] | International Renewable Energy Agency. Renewable power generations costs in 2018[R/OL]. [2020-12-01]. https://www.irena.org/publications/2019/May/Renewable-power-generation-costs-in-2018. |
[31] | 符杨, 徐涵璐, 黄玲玲. 海上风电场集电系统全寿命周期成本分析[J]. 电力系统自动化, 2016,40(21):161-167. |
FU Yang, XU Hanlu, HUANG Lingling. Life-cycle cost analysis of power collection system in offshore wind farm[J]. Automation of Electric Power Systems, 2016,40(21):161-167. | |
[32] | 魏书荣, 刘昆仑, 符杨, 等. 基于拓扑冗余度评估的大型海上风电场集电系统优化[J]. 电力系统自动化, 2018,42(18):84-90. |
WEI Shurong, LIU Kunlun, FU Yang, et al. Optimization of power collector system for large-scale offshore wind farm based on topological redundancy assessment[J]. Automation of Electric Power Systems, 2018,42(18):84-90. | |
[33] | 陈献慧, 王冰, 曹智杰, 等. 计及全寿命周期成本的海上风电场集电系统环形拓扑结构优化设计[J]. 电力学报, 2019,34(4):315-321,362. |
CHEN Xianhui, WANG Bing, CAO Zhijie, et al. Optimization design for ring collection grids of offshore wind farms considering life cycle cost[J]. Journal of Electric Power, 2019,34(4):315-321,362. | |
[34] | 诸浩君, 蔡旭, 霍达仁. 海上风电场交直流集电系统经济可靠性对比分析[J]. 科技视界, 2014(18):11-12. |
[35] | LAKSHMANAN P, LIANG J, JENKINS N. Assessment of collection systems for HVDC connected offshore wind farms[J]. Electric Power Systems Research, 2015,129:75-82. |
[36] |
DE PRADA M, IGUALADA L, CORCHERO C, et al. Hybrid AC-DC offshore wind power plant topology: Optimal design[J]. IEEE Transactions on Power Systems, 2015,30(4):1868-1876.
doi: 10.1109/TPWRS.2014.2354457 URL |
[37] |
LAKSHMANAN P, GUO J, LIANG J. Energy curtailment of DC series-parallel connected offshore wind farms[J]. IET Renewable Power Generation, 2018,12(5):576-584.
doi: 10.1049/rpg2.v12.5 URL |
[38] | International Renewable Energy Agency. Renewable energy technologies: Cost analysis series-Wind power[R]. Bonn: International Renewable Energy Agency, 2012. |
[39] | 蔡蓉, 张立波, 程濛, 等. 66 kV海上风电交流集电方案技术经济性研究[J]. 全球能源互联网, 2019,2(2):155-162. |
CAI Rong, ZHANG Libo, CHENG Meng, et al. Technical and economic research on 66 kV offshore wind power AC collection solution[J]. Journal of Global Energy Interconnection, 2019,2(2):155-162. | |
[40] | 许新鑫, 赵陆尧. 探究66 kV集电海缆在我国大型海上风电项目中的应用[J]. 机电信息, 2019(30):23-24. |
[41] | SCHLEMMER T, GREEDY L. 66 kV systems for offshore wind farms[R]. The Netherlands:DNV GL Energy, 2015. |
[42] | 王峰, 芮守娟, 王小合, 等. 66 kV海上风电交流集电方案的研究与发展前景[J]. 华电技术, 2020,42(5):61-65. |
WANG Feng, RUI Shoujuan, WANG Xiaohe, et al. Research and prospects of 66 kV offshore wind power AC collection scheme[J]. Huadian Technology, 2020,42(5):61-65. | |
[43] | 李芃达, 李东东. 海上风电场集电系统拓扑结构优化研究[J]. 电力系统保护与控制, 2016,44(18):102-107. |
LI Pengda, LI Dongdong. Study on topology optimization of electrical collector system for offshore wind farm[J]. Power System Protection and Control, 2016,44(18):102-107. | |
[44] |
HOU P, HU W H, SOLTANI M, et al. Optimized placement of wind turbines in large-scale offshore wind farm using particle swarm optimization algorithm[J]. IEEE Transactions on Sustainable Energy, 2015,6(4):1272-1282.
doi: 10.1109/TSTE.2015.2429912 URL |
[45] | 牛东晓, 赵东来, 杨尚东, 等. 基于改进粒子群算法的海上风电汇集方式与并网优化研究[J]. 中南大学学报(自然科学版), 2019,50(12):3146-3155. |
NIU Dongxiao, ZHAO Donglai, YANG Shangdong, et al. Research on convergence mode and grid-connected optimization of offshore wind power based on improved particle swarm optimization algorithm[J]. Journal of Central South University (Science and Technology), 2019,50(12):3146-3155. | |
[46] | SRIKAKULAPU R, VINATHA U. Optimal design of collector topology for offshore wind farm based on ant colony optimization approach[C]// 2016 IEEE International Conference on Power Electronics, Drives and Energy Systems (PEDES). Trivandrum, India: IEEE, 2016: 1-6. |
[47] |
HOU P, HU W H, CHEN C, et al. Optimisation of offshore wind farm cable connection layout considering levelised production cost using dynamic minimum spanning tree algorithm[J]. IET Renewable Power Generation, 2016,10(2):175-183.
doi: 10.1049/rpg2.v10.2 URL |
[48] | 樊潇, 卢永魁, 黄玲玲, 等. 大型海上风电场集电系统网络拓扑优化设计[J]. 电力系统及其自动化学报, 2016,28(7):51-56. |
FAN Xiao, LU Yongkui, HUANG Lingling, et al. Network topology optimization of electrical collection system of large-scale offshore wind farm[J]. Proceedings of the CSU-EPSA, 2016,28(7):51-56. | |
[49] | 黄玲玲, 符杨, 郭晓明. 海上风电场集电系统可靠性评估[J]. 电网技术, 2010,34(7):169-174. |
HUANG Lingling, FU Yang, GUO Xiaoming. Reliability evaluation of wind power collection system for offshore wind farm[J]. Power System Technology, 2010,34(7):169-174. | |
[50] | 王碧阳, 王锡凡, 王秀丽, 等. 考虑集电系统的风电场可靠性评估[J]. 中国电机工程学报, 2015,35(9):2105-2111. |
WANG Biyang, WANG Xifan, WANG Xiuli, et al. Reliability evaluation of wind plant considering collector grid[J]. Proceedings of the CSEE, 2015,35(9):2105-2111. | |
[51] | 符杨, 吴靖, 魏书荣. 大型海上风电场集电系统拓扑结构优化与规划[J]. 电网技术, 2013,37(9):2553-2558. |
FU Yang, WU Jing, WEI Shurong. Topology optimization and planning of power collection system for large-scale offshore wind farm[J]. Power System Technology, 2013,37(9):2553-2558. | |
[52] | 王钤, 杨苹, 赵卓立, 等. 基于链形拓扑的海上风电场集电系统可靠性评估[J]. 可再生能源, 2014,32(10):1463-1467. |
WANG Qian, YANG Ping, ZHAO Zhuoli, et al. Reliability evaluation of power collection system for offshore wind farm based on chain topology[J]. Renewable Energy Resources, 2014,32(10):1463-1467. | |
[53] | 王建东, 李国杰. 海上风电场内部电气系统布局经济性对比[J]. 电力系统自动化, 2009,33(11):99-103. |
WANG Jiandong, LI Guojie. Economic comparison of different collector networks for offshore wind farms[J]. Automation of Electric Power Systems, 2009,33(11):99-103. | |
[54] |
DAHMANI O, BOURGUET S, MACHMOUM M, et al. Optimization and reliability evaluation of an offshore wind farm architecture[J]. IEEE Transactions on Sustainable Energy, 2017,8(2):542-550.
doi: 10.1109/TSTE.2016.2609283 URL |
[55] |
SHIN J S, KIM J O. Optimal design for offshore wind farm considering inner grid layout and offshore substation location[J]. IEEE Transactions on Power Systems, 2017,32(3):2041-2048.
doi: 10.1109/TPWRS.2016.2593501 URL |
[56] | 符杨, 杨赛松, 魏书荣, 等. 考虑电磁环境约束的大型海上风电场集电网络拓扑博弈优化[J]. 电力系统自动化, 2019,43(1):201-208. |
FU Yang, YANG Saisong, WEI Shurong, et al. Game based topology optimization for power collection system of large-scale offshore wind farm considering electromagnetic environment constraints[J]. Automation of Electric Power Systems, 2019,43(1):201-208. | |
[57] |
WANG B Y, WANG X F, WANG X L, et al. An analytical approach to evaluate the reliability of offshore wind power plants considering environmental impact[J]. IEEE Transactions on Sustainable Energy, 2018,9(1):249-260.
doi: 10.1109/TSTE.2017.2727480 URL |
[58] |
CHAO H W, HU B, XIE K G, et al. A sequential MCMC model for reliability evaluation of offshore wind farms considering severe weather conditions[J]. IEEE Access, 2019,7:132552-132562.
doi: 10.1109/Access.6287639 URL |
[59] | 应启良. 我国发展直流海底电力电缆的前景[J]. 电线电缆, 2012(3):1-7, 10. |
YING Qiliang. The prospect of development of DC submarine cables in China[J]. Electric Wire & Cable, 2012(3):1-7, 10. | |
[60] |
FRANCK C M. HVDC circuit breakers: A review idenpngying future research needs[J]. IEEE Transactions on Power Delivery, 2011,26(2):998-1007.
doi: 10.1109/TPWRD.2010.2095889 URL |
[61] | LI G, LIANG J, BALASUBRAMANIAM S, et al. Frontiers of DC circuit breakers in HVDC and MVDC systems[C]// 2017 IEEE Conference on Energy Internet and Energy System Integration (EI2). Beijing, China: IEEE, 2017: 1-6. |
[62] |
HAO Y F, LIANG J, WANG K W, et al. Influence of active power output and control parameters of full-converter wind farms on sub-synchronous oscillation characteristics in weak grids[J]. Energies, 2020,13(19):5225.
doi: 10.3390/en13195225 URL |
[63] |
ADEUYI O D, CHEAH-MANE M, LIANG J, et al. Fast frequency response from offshore multi-terminal VSC-HVDC schemes[J]. IEEE Transactions on Power Delivery, 2016,32(6):2442-2452.
doi: 10.1109/TPWRD.61 URL |
[64] |
JI K, TANG G F, PANG H, et al. Impedance modeling and analysis of MMC-HVDC for offshore wind farm integration[J]. IEEE Transactions on Power Delivery, 2020,35(3):1488-1501.
doi: 10.1109/TPWRD.61 URL |
[65] | 杨建军, 俞华锋, 赵生校, 等. 海上风电场升压变电站设计基本要求的研究[J]. 中国电机工程学报, 2016,36(14):3781-3789. |
YANG Jianjun, YU Huafeng, ZHAO Shengxiao, et al. Research on basic requirements of offshore substation design[J]. Proceedings of the CSEE, 2016,36(14):3781-3789. | |
[66] | 杨源, 汤翔, 辛妍丽. 海上升压站选址优化研究[J]. 中国电力, 2020,53(7):24-28, 71. |
YANG Yuan, TANG Xiang, XIN Yanli. Research on optimal site selection for offshore wind farms substation[J]. Electric Power, 2020,53(7):24-28, 71. | |
[67] | 符杨, 马媛, 刘璐洁, 等. 海上风电机组分阶段预防性维修策略[J]. 电力建设, 2017,38(6):124-132. |
FU Yang, MA Yuan, LIU Lujie, et al. Phasic preventive maintenance strategy of offshore wind turbines[J]. Electric Power Construction, 2017,38(6):124-132. | |
[68] | 闫培丽, 袁兆祥, 齐立忠, 等. 海上风电场二次系统设计关键技术[J]. 电力建设, 2015,36(4):129-133. |
YAN Peili, YUAN Zhaoxiang, QI Lizhong, et al. Key technology of offshore wind farm secondary system design[J]. Electric Power Construction, 2015,36(4):129-133. | |
[69] |
DALGIC Y, LAZAKIS I, TURAN O. Investigation of optimum crew transfer vessel fleet for offshore wind farm maintenance operations[J]. Wind Engineering, 2015,39(1):31-52.
doi: 10.1260/0309-524X.39.1.31 URL |
[70] | 刘皓明, 赵敏, 田炜, 等. 风、浪对海上风电机组振动特性的影响及控制策略[J]. 电力自动化设备, 2020,40(1):46-51, 58. |
LIU Haoming, ZHAO Min, TIAN Wei, et al. Effect of wind and wave on vibration characteristics of offshore wind turbines and control strategy[J]. Electric Power Automation Equipment, 2020,40(1):46-51, 58. | |
[71] | 黄玲玲, 曹家麟, 张开华, 等. 海上风电机组运行维护现状研究与展望[J]. 中国电机工程学报, 2016,36(3):729-738. |
HUANG Lingling, CAO Jialin, ZHANG Kaihua, et al. Status and prospects on operation and maintenance of offshore wind turbines[J]. Proceedings of the CSEE, 2016,36(3):729-738. |
[1] | LIN Mingrong, HU Zhijian, GAO Mingxin, CHEN Jinpeng. Reliability Evaluation of Distribution Network Considering Demand Response and Road-Electricity Coupling Characteristics of Electric Vehicle Load [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(6): 86-95. |
[2] | CUI Yanyan, LIU Wei, SU Jian, LIU Jiqiu, PAN Yongchao, LI Jia, ZHANG Xianliang, ZHANG Lu. Reliability Evaluation of Integrated Energy System Considering Optimal Load Reduction and Thermal Load Inertia [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(4): 40-48. |
[3] | HUANG Ruanming, CHI Yongning, WANG Jun, ZHANG Mengyao, GUO Mingxing, LI Yan, YAO Jun. Transient Characteristics of Offshore Wind Power Sending System via Flexible HVDC Transmission System Under DC Line Breakage Fault [J]. ELECTRIC POWER CONSTRUCTION, 2021, 42(4): 97-104. |
[4] | GAO Chong, ZENG Guangxuan, ZHANG Junxiao, CAO Huazhen,TANG Junxi,YU Tao. Reliability Assessment of Distribution Network Cyber-Physical System Using Goal-Oriented Method [J]. Electric Power Construction, 2020, 41(5): 58-65. |
[5] | HUAN Jiajia, XIAO Yong, LU Wensheng, LIU Hong, PENG Jiaying, PAN Xianxian, LI Jifeng. Reliability Evaluation Method for Regional Integrated Energy System Applying Complex Network Theory [J]. Electric Power Construction, 2020, 41(4): 1-9. |
[6] | WU Hongwei, PAN Jiefeng, GE Shaoyun, FANG Yunhui, LI Jifeng. Analysis of Energy Supply Reliability of the New Generation Cyber Physical Energy System Considering Multi-Information Disturbanc [J]. Electric Power Construction, 2020, 41(3): 3-12. |
[7] | WANG Lanling, LIU Junyong, XU Lixiong, HE Xinda, TANG Jie, FANG Gang. Reliability Analysis of Integrated Energy Cyber Physical System Considering Real-Time Demand Response [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(12): 25-40. |
[8] | REN Haiquan, JIA Yanbing, TIAN Feng, BAI Yun. Reliability Evaluation of Electricity-Gas Integrated Energy System with Alternative Loads [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(12): 41-48. |
[9] | LIANG Haifeng, LI Ziyang, GUO Jie. Reliability Calculation Method for Island Microgrid Considering Electric Vehicle Charging Demand [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(11): 49-59. |
[10] | XIE Chao, LI Chenxi, ZHANG Dairun, ZENG Haodong. Reverse Identification of the Relationship of Feeder-Transformer Connectivity in Distribution Grid Applying Smart Meter Measurement Data [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(11): 94-100. |
[11] | WANG Junfeng, KONG Lingsheng, FAN Xinming, PENG Yuanquan, CHEN Hao, SONG Guanyu. Optimal Planning for Soft Open Point Integrated with ESS to Improve the Economy of Active Distribution Network [J]. ELECTRIC POWER CONSTRUCTION, 2020, 41(10): 63-70. |
[12] | LIAO Jiaqi, QIAN Kejun, FANG Hualiang, ZHOU Chengke, XU Yan. Key Technologies of Operation and Maintenance of Electric Vehicle Charging Stations in Ubiquitous Power Internet of Things [J]. Electric Power Construction, 2019, 40(9): 20-26. |
[13] | GONG Jianfeng, CAO Yuchen, HU Zhibing, CHEN Xingyi, GE Pengjiang, ZHANG Peng. Energy Management of Industrial Park Integrated Energy System Based on Improved Genetic Algorithm [J]. Electric Power Construction, 2019, 40(8): 51-58. |
[14] | ZHANG Jinhua, TIAN Shaomei, ZHANG Guiting, ZHANG Qiang, LIU Hai, ZHANG Baojian, LIU Yulong. Reliability Assessment of Rural Clean Energy Supply System Based on Accurate Modeling of User Demand [J]. Electric Power Construction, 2019, 40(8): 93-102. |
[15] | WANG Du,YANG Jia,WU Shiqiang,CHEN Zhidao,WANG Weimin,SUN Guoqiang,WEI Zhinong. Bilinear Robust State Estimation of Power System Containing UPFC [J]. Electric Power Construction, 2019, 40(7): 65-75. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||
Copyright @ ELECTRIC POWER CONSTRUCTION Editorial Office
Address: Tower A225, SGCC, Future Science & Technology Park,Beijing, China Postcode:102209 Telephone:010-66602697
Technical support: Beijing Magtech Co.ltd support@magtech.com.cn