ELECTRIC POWER CONSTRUCTION ›› 2022, Vol. 43 ›› Issue (7): 80-86.doi: 10.12204/j.issn.1000-7229.2022.07.009

• Smart Grid • Previous Articles     Next Articles

Operation Control and Protection Strategy of Domestic 500 kV DC Cable in Flexible DC Grid

ZHONG Qidi1(), PU Ying1, SUN Jianfeng2, JIANG Chongxue3, LI Tan1, ZHAO Peng4, ZHOU Yang2   

  1. 1. State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
    2. State Grid Corporation of China,Beijing 100031,China
    3. NR Electric Co., Ltd., Nanjing 211102, China
    4. China Electric Power Research Institute, Wuhan 430074,China
  • Received:2022-03-10 Online:2022-07-01 Published:2022-06-30
  • Contact: ZHONG Qidi E-mail:zhongqidi421@126.com
  • Supported by:
    National Key R&D Program of China(2016YFB0900905)

Abstract:

High-voltage DC cables are important equipment for cross-sea long-distance power transmission and new energy grid integration. DC cables with high voltage levels and current capacity are still in the research and development stage.In order to promote the research and development of high-voltage DC cables and test the long-term operation performance, this paper relies on a domestic ±500 kV flexible dc grid project to establish a DC cable comprehensive test station.The DC line of the domestic ±500 kV flexible dc grid project mainly adopts the overhead transmission line scheme. The test station is located at the single-pole outlet of one of the converter stations, and the trial DC cable runs in parallel with the overhead line.The operation control and protection coordination are complex, the reliability requirements are extremely high, and there is no engineering experience to follow.In this paper, aiming at the connection mode of parallel switching operation between 500k V DC cable test section and overhead line, the DC cable monitoring and input and exit control strategy, fault protection strategy and overload operation control protection strategy in the test station are proposed for the first time, and are verified by simulation experiments, it can realize reliable operation of DC cable access to flexible DC grid.

Key words: flexible DC grid, high-voltage DC cable, localization, protection strategy, operation control