Rss   Email Alert
A Multi-objective Optimal Scheduling Method for Integrated Energy System of Protected Agricultural Industrial Park Considering Local Consumption Rate of Wind and Solar Engery
CHEN Wei, LU Yuan, HE Xin, ZHANG Hailong, YANG Yong, CUI Jianbin
ELECTRIC POWER CONSTRUCTION . 2021, (7): 20 -27 .  DOI: 10.12204/j.issn.1000-7229.2021.07.003